Hermes documents review round 202006
Abstract
This section shares information with the Belgian Service providers about Hermes in the context of a draft review round.
Timewise, this round
started with a presentation during the 7th Belgian AP forum on .
closes on .
Review participants are invited to provide their comments by email to peppol@bosa.fgov.be.
Following documents are in the scope of this review round:
the conditions of use for senders and its technico-functional annex,
the integrators agreement,
the migration toke collection interface specification.
Documents
title | abstract | link |
---|---|---|
1.a. Hermes conditions of use | Contractual description of the Hermes service features and boundaries. | |
1.b. annex to Hermes conditions of use | The conditions of use incorporate a technico-functional appendix that lays out in more detail all the scenarios handled by Hermes and their technical details | |
2. Hermes Integrators agreeement | In addition to the convention of use, DT offers the possibility to integrators to incorporate Hermes in their service offering, and the collection of the senders' agreement with the conditions of use in their own service subscription process. For this the integrator must sign a convention of integration, that describes the responsibilities that the integrator is expected to take to insure smooth operations | |
3. HermeSMP (hsmp) migration token collection interface | offers the Peppol APs the possibility to automate the collection of the Hermes participants migration tokens. It is a REST service with the same security as smp.belgium.be. This interface specification consists in (a) a swagger; (b) a Test Plan , and (c) additional info if needed | (a) swagger: hsmp_migration_key.yaml |
(hsmp) migration token collection interface - Test Plan
Introduction
Currently only the Table of Contents of the text plan is available. However ,once it is reviewed, the Test plan will be elaborated and packaged as a Postman Project that suits for the testing of the interface. The graphical representation of the high-level description is also provided. notice however that an inconsistency was found when comparing the TOC and the viusal - the error 3 seems to overlap hsmp801. This is under investigation
High-Level Description / “table of contents”
scenario | request | response :: http - detail |
---|---|---|
positive | valid and not yet migrated enterprise number | 200 - the pair enterprise number & migration token |
security 1 | certificate missing | 401 - no certificate provided with the request |
security 2 | error while parsing certificate | 401 - error while parsing client certificate |
security 3 | certificate expired or not yet valid | 401 - client certificate expired or not yet valid |
error 1 | the enterprise number does not correspond to an existing enterprise (or is garbage) | 404 - invalid or non-existing enterprise number + id |
error 2 | the enterprise number was deleted (in the context of the monthly processing of the CBE dump or the admin removal function) | 404 - inactive enterprise number + id |
error 3 | the enterprise number that was already migrated to another smp | 404 - already migrated + id |
error 4 | any request of a used that exceeded the blacklisting limit and was not yet reactivated |
|
error 5 | internal server error | 500 - internal server error |
Visual
(hsmp) migration token collection interface - Additional info
Proposed schedule
phase | time | what |
---|---|---|
design | JUNE |
|
development and babelway test | JULY |
|
user testing | AUGUST |
|
BOSA acceptance | SEPTEMBER |
|
Currently, no need for such an additional piece of documentation is identified. During the specifications review round, review participants are invited to describe the additional documentation they would need, if any