Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

Welcome
BOSA, the Belgian Peppol Authority, welcomes you to this collaboration area dedicated to the Belgian jurisdiction. It supports the forums that we are used to organize since 2016 to assist the IT sector in widening the eInvoicing and eProcurement solutions in the Belgian market.
The structure of this area will grow gradually to best fit with the discussions and opportunities that will arise.

Enjoy your visit and let us know!
the eInvoicing team @BOSA DT.

Hermes documents review round 202006

Abstract

  • This section shares information with the Belgian Service providers about Hermes in the context of a draft review round.

  • Timewise, this round

    • started with a presentation during the 7th Belgian AP forum on .

    • closes on .

  • Review participants are invited to provide their comments by email to peppol@bosa.fgov.be.

  • Following documents are in the scope of this review round:

    1. the conditions of use for senders and its technico-functional annex,

    2. the integrators agreement,

    3. the migration toke collection interface specification.

Documents

title

abstract

link

1.a. Hermes conditions of use

Contractual description of the Hermes service features and boundaries.
The enterprise wishing to use Hermes in his outbound invoicing must accept these conditions

1.b. annex to Hermes conditions of use

The conditions of use incorporate a technico-functional appendix that lays out in more detail all the scenarios handled by Hermes and their technical details

2. Hermes Integrators agreeement

In addition to the convention of use, DT offers the possibility to integrators to incorporate Hermes in their service offering, and the collection of the senders' agreement with the conditions of use in their own service subscription process. For this the integrator must sign a convention of integration, that describes the responsibilities that the integrator is expected to take to insure smooth operations

3. HermeSMP (hsmp) migration token collection interface

offers the Peppol APs the possibility to automate the collection of the Hermes participants migration tokens. It is a REST service with the same security as smp.belgium.be. This interface specification consists in (a) a swagger; (b) a Test Plan , and (c) additional info if needed

(a) swagger: hsmp_migration_key.yaml
(b) Test plan: see test plan section
(c) additional info: see additional info section

(hsmp) migration token collection interface - Test Plan

Introduction

Currently only the Table of Contents of the text plan is available. However ,once it is reviewed, the Test plan will be elaborated and packaged as a Postman Project that suits for the testing of the interface. The graphical representation of the high-level description is also provided. notice however that an inconsistency was found when comparing the TOC and the viusal - the error 3 seems to overlap hsmp801. This is under investigation

High-Level Description / “table of contents”

scenario

request

response :: http - detail

positive

valid and not yet migrated enterprise number

200 - the pair enterprise number & migration token

security 1

certificate missing

401 - no certificate provided with the request

security 2

error while parsing certificate

401 - error while parsing client certificate

security 3

certificate expired or not yet valid

401 - client certificate expired or not yet valid

error 1

the enterprise number does not correspond to an existing enterprise (or is garbage)

404 - invalid or non-existing enterprise number + id

error 2

the enterprise number was deleted (in the context of the monthly processing of the CBE dump or the admin removal function)

404 - inactive enterprise number + id

error 3

the enterprise number that was already migrated to another smp

404 - already migrated + id

error 4

any request of a used that exceeded the blacklisting limit and was not yet reactivated

429 403 - you have been blacklisted please contact BOSA

error 5

internal server error

500 - internal server error

Visual

(hsmp) migration token collection interface - Additional info

Proposed schedule

phase

time

what

design

JUNE

  • AP forum: discuss the interface specifications, practicalities

  • then post a draft proposal to collect comments (2weeks)

  • then publish (initial) documentation package ( swagger + Test plan + read-me ) and schedule on agreed repository

development and babelway test

JULY

  • includes update of the documentation package at end of dev phase

user testing

AUGUST

  • includes collection of test results, fixing, updating the documentation package

BOSA acceptance

SEPTEMBER

  • verify that the outcomes of the previous phases meet the expectations

Currently, no need for such an additional piece of documentation is identified. During the specifications review round, review participants are invited to describe the additional documentation they would need, if any

  • No labels