Testbed Taskforce - Testbed Design - Stage 1 (201807??)
Scope
- Onboarding test
- Scoped from Testbed architecture vision Architectural Building Blocks (ABB)
- Solution Building Blocks is designs from ABBs
Solution design
Solution Building Blocks:
- UI - Web/Portal/Registration
- Orchestration
- AP administration Rest interface
- Access Points
- TB Rest interface
- Virtual TB AP with proxy endpoint
Testbed functionality
Scoped and prioritized:
UI (Mike)
- Access control by the means of PEPPOL certificate (priority 1)
- Show log of received transactions from a specific sender (priority 1)
- Produce from the test log a report of test runs (priority 1)
- Choice of Testbed send/recieve AP (priority 1)
- Activate sending a transaction to specific AP (controled by the access control) (priority 1)
- Transaction chosen from a list of (positive)Test instances
- Though a Testbed AP choosen from a list of Testbed active APs
- To a specific AP (SUT) controlled by the access control
Orchestration (Mike)
- Test log of received and sended transactions for a specific SUT (priority 1)
- Activate specific (positive) transactions to be send to a specific receiver through a choosen testbed AP (priority 1)
- Set of generic test instances to be used as transactions (priority 1)
- Orchestration - TB monitor and AP proxy Rest interface (priority 2)
Rest interface (Orchestration-AP) (Mike-Philip-Erland)
- "Philip AP" (priority 1)
- Oxalis (priority 1)
Access Points (Philip-Erland)
- "Philip AP" (priority 1) (Philip)
- Oxalis (priority 1) (Erland)
TB monitor and AP proxy
- Logging of transactions performed (priority 2)
- Orchestration - TB monitor and AP proxy Rest interface (priority 2)
Misc
- Analyze how to deal with negative test cases (priority 1)
- Implement negative test cases (priority 2) (all)
- Test method (priority 1) (Klaus)
- Production site and governance (priority 2) (all)
Plan (Klaus)
29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | |||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Draft stage 1 design | ||||||||||||||||||||||||||
Test method | ||||||||||||||||||||||||||