...
Elected members (with voting right)
Risto Collanus (Visma)
Bård Langöy (Pagero)
Rune Kjørlaug (Unlicensed) (DIFI)
Hans Berg (Unlicensed) (Tickstar)
Guests (without voting right)
...
- Decision: accepted the CRJira Legacy server System JIRA serverId b5b0ccd0-0a1a-35a3-9e9e-6e3b9531d004 key TICC-95 - Action:
- Merge process identifier code list into the document type code list, assigning each document type identifier exactly the one process identifier in which it can be used
- The assumption is, that document type and process identifiers are always used in combination
- Check with Pre-Award, that this does not break any of their requirements
- Responsible: Philip Helger to change the code lists and check with Jerry Dimitriou
- Action:
: Certificate is missing but was requested - postponed Philip Helger push GeorgJira Legacy server System JIRA serverId b5b0ccd0-0a1a-35a3-9e9e-6e3b9531d004 key TICC-93
: Certificate is missing but was requested - postponed Philip Helger push GeorgJira Legacy server System JIRA serverId b5b0ccd0-0a1a-35a3-9e9e-6e3b9531d004 key TICC-92
- Decision: allow hyphenJira Legacy server System JIRA serverId b5b0ccd0-0a1a-35a3-9e9e-6e3b9531d004 key TICC-88 - Action: First stepReview:
- PEPPOL-EDN-Policy-for-use-of-identifiers-4.0-2019-01-28.pdf
- Update the requirements for requesting new participant identifier schemes, so that the validation rules for new schemes must also be provided upon request
- This will result in v4.0.1 of the Policy - v3 will not be changed
- This document is referenced from current Annex 4 and needs special consideration when publishing Second step:
- clarify normalization rules for all ICD values
- Provide the validation rules for all participant identifier scheme values in a machine readable way
- Update the Policy for use of Identifiers, that "Participant identifier" values must be validated in the SMP, before they are registered in the SML
- State, that the validation rules are in the code list This will result in v4.1 - v3 will not get updated
- Deadline 12th of September 2019 EoB!
https://github.com/OpenPEPPOL/documentation/tree/master/TransportInfrastructure/work%20in%20progress
Bård Langöy, Hans Berg (Unlicensed), Rune Kjørlaug (Unlicensed), Risto Collanus, Klaus Vilstrup Pedersen (Unlicensed)
- Responsible: Bård Langöy, Philip Helger
- Action: To be moved into AS4 workgroup, first discussed byJira Legacy server System JIRA serverId b5b0ccd0-0a1a-35a3-9e9e-6e3b9531d004 key TICC-85 - Need clarification in the OpenPEPPOL AS4 profile - on the agenda in 15-16th october in Brussels (how to handle these kinds of issues Klaus Vilstrup Pedersen (Unlicensed)
- need clarrification in the OpenPEPPOL AS4 profile
Jira Legacy server System JIRA serverId b5b0ccd0-0a1a-35a3-9e9e-6e3b9531d004 key TICC-84 - Proposed Decision:
1) if empty then it MUST be interpreted as that the service is active (non-expired).
2) If a date is in either of the elements they MUST be respected by the sending AP (C2) and actions according to SMP specification should apply. - Action: Investigate the consequence of the problem Philip Helger (count the number of SMP endpoints that use ServiceExpiration/ActivationDate)
- Proposed Decision:
83Jira Legacy server System JIRA serverId b5b0ccd0-0a1a-35a3-9e9e-6e3b9531d004 key TICC-
: Agreed on the change, prepare the updated documents (without releasing it). This effects only v2 - v1 will not be updated.Jira Legacy server System JIRA serverId b5b0ccd0-0a1a-35a3-9e9e-6e3b9531d004 key TICC-80
: Comment https://github.com/OpenPEPPOL/documentation/tree/master/TransportInfrastructure/work%20in%20progress80 Bård Langöy, Hans Berg (Unlicensed), Rune Kjørlaug (Unlicensed), Risto Collanus, Klaus Vilstrup Pedersen (Unlicensed)
- Deadline 12th of September 2019 EoB!
: Remove off boarded SMPs from SML (along with the participants registered) - assign to OO? Klaus Vilstrup Pedersen (Unlicensed) talk to Philip Helger. Jesper has list.Jira Legacy server System JIRA serverId b5b0ccd0-0a1a-35a3-9e9e-6e3b9531d004 key TICC-19 - Define rules, when an SMP is considered dead.
- Migration policy for AS2 spec., visit TICC CMB 2019-02-12 minutes for input on this topic.
- #
...
- Asset list and processes
- Next CC F2F meeting 15-16 October in Brussels
- Agenda
- Introduction (1 hour)AS2
- Recap
- AS4, Codelist etc.
- New Agreement
- Artifact list
- news from CMB
- Recap
- AS4 WG (2 hours)
- Transition
- Support
- Other topics
- Next steps
- Enhanced security WG (3 hours)
- Set up a framework
- Needs and requirements
- Next steps
- Set up a framework
- SML/SMP WG (3 hours)
- Requirements gathering
- CEF SML
- Demonstration and insight into the solution
- Q&A
- Next steps and plan
- Misc. (1 hour)
- "5-corner model" (1 hour)
- Use-cases
- "5-corner model" (1 hour)
- Introduction (1 hour)AS2
- Agenda
- Reporting ORDWG - Philip Helger
- Discussion next meeting
...