Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The Project Working Group has produced and/or collected the following documents which specify the features and processes of participation in the eB2B Domain Starting Environment.

Specifications (eB2B Domain-Specific Requirements)

  • Incubation Business and Technical requirements - 1.0-RC.docx

  • Enhanced B2B Solution Architecture 0.8.0 - WiP.docx

Supporting Specifications

  • eB2B Specification.docx (EN16931-eB2B Extension, Digital Annexes)

  • BIS Message Level Status 3.0 - draft 2.pdf

  • 2023-11-30 OpenPeppol SP ID Scheme.docx

  • Peppol-EDN-Business-Message-Envelope-2.0.1-2023-08-17.pdf

  • PEPPOL-EDN-Policy-for-use-of-identifiers-4.2.0-2023-06-19.pdf

Background Material

  • 20240709_GENA_LegalReview_RC.docx

Attachments
uploadtrue